b'Geophysics in the surveys NewsTable 3.Airborne electromagnetic surveysSurvey name Client ProjectContractor StartLine km SpacingAreaEndFinalLocality diagramGADDS releasemanagement flying AGL Dir (km2) flying data to(Preview)GAWesternGA/ GA XcaliburMar~ 38 000 20 km760 000 TBA TBA See Figure 1 inTBAResourcesGSWA Multiphysics 2022 previous section Corridor (GA News)Musgraves GA GA XcaliburJun ~ 22 000 15 km ~ 100 000 TBA TBA See Figure 1 inTBAMultiphysics 2022 previous section (GA News)Upper DarlingGA GA SkyTEM Mar25 000 .255 km TBA TBA See Figure 1 inTBARiver 2022 previous section (GA News)Darling- GA GA SkyTEM Jun 14 500 110 km TBA TBA See Figure 1 inTBACurnamona- 2022 previous section Delamerian (GA News)EasternGAGA XcaliburApr32 000 20 km 640 000 JulOctSee Figure 1 inOct 2021ResourcesMultiphysics 2021 2021 2021 previous section http://pid.Corridor geoscience.gov.au/dataset/ga/145744Mundi GSNSW GA NRG Mar1900 2.5 ~ 5000 AprDecSee Figure 1 inOct 2021 2021 2021 2021 previous sectionhttps://ecat.ga.gov.(GA News) au/geonetwork/srv/eng/catalog.search#/metadata/145897 or https://www.regional.nsw.gov.au/meg/geoscience/minexcrc/mundiAusAEM20 GSWA GA XcaliburAug62 000 20 km 1 240 000 Nov 21 DecSee Figure1 inMar 2022 Multiphysics2020 2021 previous sectionsee http://pid.& SkyTEM (GA News) geoscience.gov.au/dataset/ga/146345TBA, to be advisedTable 4.Magnetotelluric (MT) surveys Location Client State Survey name Total number of MTSpacing Technique Commentsstations deployedNorthernGA Qld/NT Exploring for366 stations deployed 50 km Long periodThe survey covers areas of NT and Qld.Australia the Future in 201619 MT Data package: http://pid.geoscience.gov.au/AusLAMP 32 stations deployeddataset/ga/134997 in 2021 Model: http://pid.geoscience.gov.au/dataset/ga/145233News article: http://www.ga.gov.au/news-events/news/latest-news/exploring-for-the-future-takes-a-deeper-look-at-northern-australiaAcquisition of 32 new sites in SW Qld completed mid-2021, data to be released late 2022 together with additional data planned to be acquired under Exploring for the Future during 2022.AusLAMP GSNSW/NSW AusLAMP NSW ~300 stations50 km Long periodCovering the state of NSW. Acquisition is NSW GA deployed 2016-21 MT essentially complete with fewer than 10 sites remaining to be acquired or reacquired.Phase 1 data release: http://pid.geoscience.gov.au/dataset/ga/132148.SoutheastGSV/ Vic/ SE Lachlan Deployment planned~4 km AMT and~160 stations in the Southeast Lachlan. Lachlan GSNSW/ NSW to commence early/ BBMT Acquisition delayed due to COVID-19 travel GA mid-2021 restrictions.Spencer Gulf GA/GSSA/ SA Offshore12 stations completed 10 km BBMT This is a pilot project for marine MT acquisition.UofA/ marine MT https://www.auscope.org.au/news-features/AuScope auslamp-marine-01Preliminary results were presented at the Australasian Exploration Geoscience Conference in Sep 2021.TBA, to be advised21 PREVIEW JUNE 2022'